Sunday 25 December 2011

The Swimming Pool: Day 8

The retaining wall for the bank has been built and the plumbing completed apart from the solar heating connections on the roof.  The concrete hasn't been done because of the poor weather but the base is done and it's beginning to look as though the end is in sight.  Even the chemicals are in the water turning it a rather muddy green.


2 comments:

  1. Somehow it looked more inviting when blue! It will probably all look just perfect when the surrounding is finished as well though.

    ReplyDelete
  2. I really like the retaining wall. Very nice. The water should clear up after the chemicals are in and balanced; don't despair it will soon be crystal clear. Will the deck be all concrete?

    ReplyDelete